CFTC Regulation of RTO-Administered Capacity Markets
| Pages | 59-77 |
| Date | 01 March 2026 |
| Published date | 01 March 2026 |
| Author | Patrick Seroogy |
| Subject Matter | Administrative & Public Law |
MAR/APR 2026 ENVIRONMENTAL LAW REPORTER 56 ELR 10143
Author’s Note: The views and opinions expressed in this Ar-
ticle are the author’s own and do not necessarily reflect any
position of Enhesa nor any of its employees. He would like
to thank Peter Malyshev for teaching the course in which
the early drafts of this Article were developed.
CFTC REGULATION OF
RTO-ADMINISTERED CAPACITY
MARKETS: OBSTACLES OR LESSONS?
by Patrick Seroogy
Patrick Seroogy, J.D., is an environmental, health, and safety regulatory consultant at Enhesa.
Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) operate, and the
Federal Energy Regulatory Commission (FERC) oversees, wholesale electricity markets that facilitate sale
and purchase of electricity. Some transactions were potentially subject to Commodity Futures Trading Com-
mission (CFTC) jurisdiction after the Dodd-Frank Act, but the agency later exempted transactions compli-
ant with FERC-authorized tarif fs. Through the electricity capacity market, RTOs/ISOs aim to secure reliable
electricity supply and meet future demand, but various aspects of this market’s design have been criticized
for its long-term effectiveness and ensuing impact on grid reliability, prompting various reform proposals.
This Article considers whether adopting or modeling CFTC regulation could assist or inform such reform. It
concludes that FERC regulation is substantially similar to CFTC regulation in terms of market and compliance
monitoring, but is appropriately tailored to physical electricity markets; and it is not clear whether adopting
CFTC regulation would help or hurt efficient administration of these markets.
SUMMARYSUMMARY
e United States economy runs on enormous quantities
of energy, much of which is used in the form of electr ic-
ity that is generated, tr ansmitted, and distributed throu gh
the electric ity grid.... e modern electricity grid is
so complex that it seems almos t impossible that it is able
to function as well a nd as reliably as it does. A merican
households and businesses t ake for granted th at the grid
will provide power on demand at al l times and in virtua lly
any circumsta nces short of a catastrophic natura l disaster.1
e electric grid, interchangeably cal led the power grid or
transmission grid, is a “vast, s ynchronized machine” slowly
built up by thousands of smaller utilities and cobbled
together over a century.2 e grid is made up of transform-
ers, substations, and thousands of miles of transmission
lines that facilitate the generation, transmission, and dis-
1. Todd Aagaard & Andrew N. Kleit, Too Much Is Never Enough: Constructing
Electricity Capacity Market Demand, 43 E L.J. 79, 80 (2022).
2. Nadja Popovich & Brad Plumer, Why the U.S. Electric Grid Isn’t Ready for the
Energy Transition, N.Y. T (June 12, 2023), https://www.nytimes.com/
interactive/2023/06/12/climate/us-electric-grid-energy-transition.html.
tribution of electricity.3 ere are three large, primary
regional power grids in the United States, called “ intercon-
nections,” that operate largely independently of each other:
the Eastern Interconnect ion, the Western Interconnection,
and the Electric Reliability Council of Texas (ERCOT).4
Each regional power grid is composed of local gr ids that
are physically interconnected into a broader network: this
makes for better reliability (and commercial enterprise) by
“providing multiple routes for power to ow and allow-
ing generators to supply electricity to many load centers.
is redundancy helps prevent transmission line or power
plant failures from causing interruptions in ser vice to retail
cu st om er s.” 5 While the interconnections describe the grid’s
physical network, the entities that operate the grid, keep
electricity owing, and keep elect ricity demand and supply
balanced are the ba lancing authorities: Regional Transmis-
sion Organizations (RTOs), Independent System Opera-
tors (ISOs), Power Marketing Administrations (PMAs),
and electric utilities, whether investor-owned, tribal, coop-
erative, or municipal.6
3. U.S. Energy Information Administration (EIA), Electricity Explained: How
Electricity Is Delivered to Consumers, https://www.eia.gov/energyexplained/
electricity/delivery-to-consumers.php (last updated Apr. 16, 2024).
4. Id.
5. Id.
6. Id. (“Most of the balancing authorities are electric utilities that have taken
on the [electricity] balancing responsibilities for a specic part of the power
system. All of the [RTOs] in the United States also function as balancing au-
Copyright © 2026 Environmental Law Institute®, Washington, DC. Reprinted with permission from ELR®, https://www.eli.org
56 ELR 10144 ENVIRONMENTAL LAW REPORTER MAR/APR 2026
Figure 1. U.S. Electric Power Regions
Interconnectors
Eastern (light grey)
ERCOT (black)
Western (dark grey)
Circles represent the 66
balancing authorities
RTOs and ISOs (hereinafter RTOs)7 are electric power
transmission system operators (i.e., “grid” operators) that
coordinate, control, and monitor the transfer of electricity
along parts of the grid’s transmission networks, ensuring
their reliability and preventing undue discrimination in
access to the grid.8 ey, along with other bala ncing author-
ities, occupy all space of the contiguous United States and
its interconnections (as seen in Figure 1) that have a grid.9
thorities.”); Federal Power Marketing Administrations Operate Across Much of
the United States, EIA (June 12, 2013), https://www.eia.gov/todayinenergy/
detail.php?id=11651 (“All four of the PMAs function as balancing authori-
ties for their regions.”). See also Sara Ho, U.S. Electric System Is Made Up
of Interconnections and Balancing Authorities, EIA (July 20, 2016), https://
www.eia.gov/todayinenergy/detail.php?id=27152.
EIA uses the denition of “balancing authority” provided by the North
American Reliability Corporation (NERC): “e responsible entity that
integrates resource plans ahead of time, maintains load-interchange-gener-
ation balance within a Balancing Authority Area, and supports Intercon-
nection frequency in real time.” EIA, Glossary, https://www.eia.gov/tools/
glossary/index.php?id=B (last visited Feb. 13, 2026) (citing NERC, Glos-
sary of Terms Used in Reliability Standards 2 (Nov. 5, 2025), https://www.
nerc.com/globalassets/standards/reliability-standards/glossary_of_terms.
pdf. See also id. (dening “Balancing Authority Area” as “e collection of
generation, transmission, and loads within the metered boundaries of the
Balancing Authority. e Balancing Authority maintains load resource bal-
ance within this area.”).
7. RTOs and ISOs are not one and the same, but their roles and functions are
similar enough to warrant using one acronym to refer to both entities for the
purpose of this Article, dierentiated in text as necessary.
8. Federal Energy Regulatory Commission (FERC), Energy Markets, https://
www.ferc.gov/opp/energy-markets (last updated Aug. 18, 2025).
9. Ho, supra note 6 (displaying map of interconnections, RTOs and ISOs,
and other balancing authorities in the contiguous United States); EIA, supra
note 3 (displaying same map). While the map states that there are 66 bal-
ancing authorities (BAs) operating in the contiguous United States, other,
more recent EIA data indicate that there are 62 BAs operating at the time
of writing. See EIA, Hourly Electric Grid Monitor: About the EIA-930 Data,
https://www.eia.gov/electricity/gridmonitor/about (last visited Feb. 24,
2026) (providing a list of 77 historical BAs, 15 of which are indicated to
have retired across both Canada and the United States, and indicating that
62 BAs are still operating in the contiguous United States). Six BAs have
retired since “July 1, 2015, the rst date of” the EIA reporting the hourly
operating data of BAs, either because they were incorporated into another’s
system or they “made other arrangements[.]” Id.
Hawaii10 and Alaska11 have their own electricity grids and
are not part of any of the mainla nd interconnections.
e Federal Energy Regulatory Commission (FERC) is
the primary federa l regulatory body for the transmission of
electricity (and natural gas).12 It oversees the operation of
RTOs and reviews their eorts to operate and coordinate
the grid reliably (with the exception of ERCOT, which
is outside of FERC’s jurisdiction).13 FERC is empowered
under the Federal Power Act (FPA) with ensuring that the
e same EIA webpage that provides a list indicating retired BAs mis-
takenly says elsewhere on the page that there are ve retired BAs, missing
one (Grith Energy, LLC (GRIF)) provided in the “List of balancing au-
thorities” at the top of the page. See id. Another EIA “real-time” dashboard
indicates that it receives and reports hourly data from 68 BAs, but six of
them are those that the EIA has indicated have retired. See id.; EIA, Hourly
Electric Grid Monitor: U.S. Electricity Overview (U.S. Lower 48), https://
www.eia.gov/electricity/gridmonitor/dashboard/electric_overview/US48/
US48 (last visited Feb. 24, 2026) (displaying, under the “View” drop-down
option for “Balancing authority electricity overview” and under “List View,”
that real-time updates are being received from 68 BAs).
10. “Each of Hawaii’s six main islands has its own electrical grid, not connected
to any other island” and “four electric utility companies [are] engaged in
the production, purchase, transmission, distribution, and sale of electric
energy in the State[,]” and in this capacity they are functionally balanc-
ing authorities. See Hawaii Public Utilities Commission, Energy, https://
puc.hawaii.gov/energy/ (last updated July 2025). See also FERC, Reliabil-
ity Explainer, https://www.ferc.gov/reliability-explainer (last updated Aug.
16, 2023) (“FERC certied NERC as the Electric Reliability Organization
for the United States mainland, not including Alaska and Hawaii[,]” and
NERC can develop and legally enforce reliability standards for the power
grid); Singularity, Open Grid Emissions: Summary of the Data, https://docs.
singularity.energy/docs/open-grid-emissions/using_the_data-summary-of-
the-data (last visited Feb. 24, 2026) (BAs in Hawaii and Alaska “do not
report their electricity interchange to the EIA.”).
11. See id.; University of Alaska Fairbanks, Alaska’s Arctic Energy System, https://
uaf-iarc.org/alaska-arctic-policy-trends/energy-issues/arctic-energy/ (last
visited Feb. 10, 2026) (“[m]ore than 150 standalone electrical grids make
up the state’s energy system” and “[o]ver 100 utilities deliver energy to Alas-
ka consumers[,with m]ost electric utilities [being] small, often serving just
one community, with electric loads varying”).
12. FERC, What FERC Does, https://www.ferc.gov/what-ferc-does (last updat-
ed June 18, 2025).
13. FERC, supra note 8.
Copyright © 2026 Environmental Law Institute®, Washington, DC. Reprinted with permission from ELR®, https://www.eli.org
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting